A US$498 million tailings project challenges a familiar assumption: when technology makes discarded material valuable, who owns the minerals—and who inherits the environmental risk?
10th October 2026 | Mining & Natural Resources, Property & Environment
Mine tailings are often presented as the end of the production process: material left over after an ore body has yielded its commercially recoverable minerals. Advances in processing can turn that apparent waste into the next source of revenue.
On 7th October 2026, ZCCM-IH announced its approval of Konkola Copper Mines’ proposed US$498 million Nchanga Tailings Leach Plant, following an engineering, procurement and construction agreement signed with China NERIN Engineering on 17th September. The announcement is about a proposed facility, not proof that commercial production has begun.
Who owns minerals in material already extracted?
Zambian minerals law distinguishes ownership of minerals in the ground from rights arising after lawful extraction and processing. The starting points for a particular tailings stockpile will include the Minerals Regulation Commission Act No. 14 of 2024, the applicable mining rights and the chain of title to the material.
Contractual history matters. An earlier owner may have sold assets but retained specified stockpiles; a financing agreement may charge inventory; a joint-venture arrangement may allocate recovered metals differently from primary ore. Calling the material “waste” settles none of these questions.
Environmental liabilities do not disappear with yesterday’s production
Tailings may carry risks to soil, water and surrounding communities. Reprocessing can reduce a historic stockpile while generating new residues and operational exposure. The Environmental Management Act No. 12 of 2011 and licensing conditions require careful attention to assessments, pollution prevention, waste management and remediation.
A transaction involving tailings should therefore address environmental baseline studies, historical contamination, indemnities, insurance and the funding of closure or remediation. The party receiving the economic benefit may not be the party that originally created the problem.
A different type of mining investment
Reprocessing projects can make use of existing infrastructure and recover metal otherwise lost. But feasibility depends on metallurgical recovery, energy and acid supply, permitting, ownership and commercially viable processing costs. EPC contracts should address performance testing, commissioning, defects and the treatment of delayed completion.
The most expensive mistake would be to value only the recoverable copper. Old waste can produce new profits—and reveal liabilities that have been waiting patiently for their next owner.